Categorized | News

Big Island lane closures for the week of August 1-5, 2011

MEDIA RELEASE

PLEASE NOTE:
Lane closure schedules may change at any time without further notice.
All projects are weather permitting.

— HAWAII BELT ROAD (ROUTE 19) —

1) VICINITY OF LAUPAHOEHOE GULCH
Alternating single lane closures on Hawaii Belt Road (Route 19) in both directions from Laupahoehoe Point Road to Laupahoehoe Gulch, also known as the “Second Horseshoe,” near Milepost 26.1, on Monday, August 1, through Friday, August 5, from
8 a.m. to 3 p.m., daily, for slope stabilization work.

— MAMALAHOA HIGHWAY (ROUTE 190) —

1) VICINITY OF MAKALEI
Alternating lane closures on Mamalahoa Highway (Route 190) in both directions near Mileposts 27 and 31 in the vicinity of Makalei on Monday, August 1, through Friday,
July 29, from 8 a.m. to 3 p.m., daily, for slope stabilization work.

2) VICINITY OF WAIKOLOA
A fulltime (24/7) lane closure on Mamalahoa Highway (Route 190) in the Kona (southbound) direction near Milepost 14 from May 31, through Friday, August 5, for the wall construction and guardrail installations. A temporary traffic signal is employed to control traffic through this work area.

— MAMALAHOA HIGHWAY (ROUTE 11) —

1) VICINITY OF KAHUKU
Alternating lane closures on Mamalahoa Highway (Route 11) in both directions between Mileposts 69 and 72 in the vicinity of South Point Road on Monday, August 1, through Friday, August 5, from 8 a.m. to 3 p.m., daily, for pavement resurfacing and guardrail installations.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

 

Quantcast