Categorized | News

Big Island lane closures for January 1-7, 2011

MEDIA RELEASE

For the week of Saturday, January 1, to Friday, January 7.

PLEASE NOTE:
Lane closure schedules may change at any time without further notice.
All projects are weather permitting.

— AKONI PULE HIGHWAY (ROUTE 270) —

1) NORTH KOHALA
Alternating single lane closures on Akoni Pule Highway (Route 270), in both directions near Niulii, from Kapanala Road to Waikama Road, between Milepost Markers 26.2 and 28.4, on Monday, January 3, through Friday, January 7, from 8:30 a.m. to 3 p.m., daily, for rock scaling of embankment.

— HAWAII BELT ROAD (ROUTE 19) —

1) NEAR LAUPAHOEHOE GULCH
Alternating single lane closures on Hawaii Belt Road (Route 19) in both directions from Laupahoehoe Point Road to Laupahoehoe Gulch, also known as the Second Horseshoe, near Milepost Marker 26.1, on Monday, January 3, through Friday, January 7, from 8:30 a.m. to 3 p.m., daily for slope stabilization work.

2) NEAR KIHOLO SCENIC LOOKOUT
Alternating single lane closures on Hawaii Belt Road (Route 19) in both directions at the vicinity of the Kiholo Scenic Lookout, near Milepost Marker 81.63, on Monday, January 3, through Friday, January 7, from 8:30 a.m. to 3 p.m., daily, for sign installations and roadway excavation.

— KOHALA MOUNTAIN ROAD (ROUTE 250) —

1) KAMUELA
Alternating single lane closures on Kohala Mountain Road (Route 250) in both directions from Kawaihae Road (Route 19), near the Waiaka Stream Bridge, to Kohala Ranch Road, on Monday, January 3, through Friday, January 7, from 8:30 a.m. to 3 p.m., daily, for guardrail installations.

— MAMALAHOA HIGHWAY (ROUTE 190) —

1) NEAR WAIKOLOA JUNCTION
Alternating single lane closures on Mamalahoa Highway (Route 190) in both directions near Waikoloa Junction, near Milepost Marker 12.1, on Monday, January 3, through Friday, January 7, from 8:30 a.m. to 3 p.m., daily, for sign installations.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

 

Quantcast